Site Search:
Sign in | Join | Help

Browse by Tags

  • GP 10 (IM 10) Project Accounting importing timesheet

    Hi guys! I've have the following problem which I am trying to resolve for the last 16 hours... We were using Integration Manager 9.0 for timesheet transaction. I created an integration and it is still working. About 3 month ago we switched to GP 10 SP1, IM 10 and eConnect 10. Now, I am trying to...
    Posted to eConnect for Dynamics GP (Forum) by Inna Vine on 06-25-2008
  • Importing Data from MYSQL to MS GP

    Hi, all I am very new to this concept and the ERP of microsoft. I really do not know where my query fits into, if iam at a wrong place hope you guide me to right place. coming on to my query, i have an application which uses MYSQL as its Database. It generates a data which is stored in a table. The requirement...
    Posted to eConnect for Dynamics GP (Forum) by Saif on 06-23-2008
  • eConnect Project Entry Error

    Hi, which has to be used for project entry eConCall.eConnect_EntryPoint or eConCall.eConnect_Requester? Is there any example as we are getting System.Data.SqlClient.SqlException:System error. We tried both we are not able to validate the XML before we could validate this error is getting displayed. Can...
    Posted to eConnect for Dynamics GP (Forum) by arvindpnr on 06-17-2008
Page 1 of 1 (3 items)